The Lekhnath Small Town Water Supply and Sanitation Project serves as a major infrastructure initiative to provide clean, accessible water to the plain areas and lower-elevation hill zones of Lekhnath Municipality.
The project integrates six primary water supply schemes, divided between original pilot systems and subsequent expansion phases:
-
1. Lapsidanda Water Supply System (New System): Constructed under the initial Small Town Water Supply and Sanitation Sector Project (STWSSSP) framework to cover newly expanded service zones.
-
2. Dandanak Water Supply System (New System): Developed alongside Lapsidanda to tap additional sources and extend coverage across lower-lying residential wards.
-
3. Arghaun Water Supply System (Existing System): An older pre-existing system integrated and rehabilitated under the project to ensure uninterrupted flow and uniform quality standards.
-
4. Shishuwakhudi Water Supply System (Existing System): Another baseline existing scheme brought under the central operational framework of the Lekhnath Small Town Water Supply Users and Sanitation Committee (STWSUSC).
-
5. First Co-Finance Water Supply System: Implemented under a cost-sharing/co-financing model (typically involving government funding, community user contributions, and institutional loans) to increase reservoir and distribution network capacity.
-
6. Second Co-Finance Water Supply System: A further phase expansion designed to keep pace with rapid urbanization, population growth, and rising daily demand in the municipality.
SALIENT FEATURES
1. Total Intake Structures = 2 nos. (Guinjekhola Intake, Thadokhola Intake)
2. Plain Sedimentation Tank = 2 Units
3. Rapid Sand Filters : 1 Unit
4. Floculation Chamber : 1 Unit
5. Grit Chamber : 1 Unit
6. Roughing Filter = 1 Unit
7. Pressure Filters = 9 Units
8. Distribution Chamber = 1 no.
9. Break Pressure CHambers : 8 Units
10 Transmission Pipeline from Guinje Khola to Lapsidanda = 12.29 km
11. 180 cum Reservoirs Tank = 2 nos. (at lapsidanda ws system, Pokhara - 26)
12. 400 cum Reservoirs Tank = 2 nos. (at dandakonak ws system, Pokhara - 27)
13. 150 cum Reservoirs Tank = 2 nos. (at shishuwakhudi ws system, Pokhara - 27)
14. 100 cum Reservoir Tank = 1 no.(at arghaun ws system, Pokhara - 26)
15. 300 cum Reservoir Tank = 1 no. (at Khueledanda, Dandakonak WSS, Pokhara - 27)
16. 200 cum Reservoir Tank = 1 no. (at Paitekharane, Arghaun WSS, Pokhara - 26)
17. 100 cum Reservoir Tank = 1 no. (Bijayapur Plotting Area, Pokhara - 26)
18. 200 cum Reservoir Tank = 1 no. (Kulayena Mandir Area, Pokhara - 26)
19. 200 cum Reservoir Tank = 1 no. (Pipalsare Area, Pokhara -26)
20. 400 Cum Reservoir Tank = 1 no. (Narespur Area, Pokhara - 26)
21. 100 cum Reservoir Tank = 1 no. (Thumako Danda Area, Pokhara - 26)
22. 200 cum Reservoir Tank = 1 no. (Tigertop Area, Pokhara - 26)
23. Iron Remover Filter Plant at Panditthar Khahare - 1 Unit.
24. Iron Remover Filter Plant at Dhungepatan - 1 Unit.
25. Iron Remover Filter Plant at Paitekharane - 1 Unit.
26. Total Distribution Pipe Line = 515 km
27. Pipe sizes used in Transmission pipeline = 355 mm dia HDPE pipe to 200 mm dia D.I. Pipes.
28. Pipe sizes used in Distribution pipeline = 250 mm dia HDPE pipe to 32 mm dia G.I. Pipes.
29. Break Pressure Tank = 4 nos. (one in Lapsidanda WS System & three in Dandakonak WS system)
30. Collection Chamber = 1 no. (Arghaun WS System)
31. Valve Chambers = 70 nos.
32. Washout Valve = 40 nos.
33. Air Valves = 50 nos.
ADDITIONAL STRUCTURES CONSTRUCTED BY WUSC
1. Jyamirikuna Deep Boring = 1 number, Capacity 8 lps
2. Dandakonak deep Boring = 1 number, Capacity 8 lps
3. Panditthar Deep Boring = 1 number, Capacity 20 lps
4. Paitekharane Deep Boring = 1 number, Capacity 15 lps
5. Bijayapur Bhawanichowk Deep Boring = 2 number, Capacity 12 lps
6. Dhungepatan Deep Boring = 1 number, Capacity 15 lps
7. Gumaj Shishuwa Deep Boring = 1 number, Capacity 20 lps
8. Mohari Deep Boring = 1 numner, Capacity, 2.5 lps
9. Syangkhudi Deep Boring = 1 number, Not in Use
ADDITIONAL STRUCTURES CONSTRUCTED UNDER REHAB PROJECT
1. 300 Cum RVT at Lekhnath (Pokhara -29, Khueledanda)
2. 200 Cum RVT at Lekhnath (Pokhara - 26, Paitedanda)
3. Iron Remover Filter Plant at Panditthar Khahare - 1 Unit (Pokhara - 26)
4. 15.5 meter long span Truss Bridge at chilaune danda are - 1 unit
5. Office Building at Pokhara Lekhnath-30, Dhungepatan, Pradesh No 4
6. 900 meters DI pipe Laying at Main Pipeline Giunjekhola Area
7. 2500 meters 90mm HDPE Pipe Laying from Arghaunchowk to Talchowk.
8. Small Dam constructed at Giunjekhola





OPENING HOUR
SUNDAY - THURSDAY
9:00 AM - 5:00 PM
FRIDAY
9:00 AM - 4:00 PM

ADDRESS
Pokhara Metropolitan City
Ward No. 30, Khudi, Dhungepatan, Kaski
Tel : 00977-061-504-195
Fax : 00977-061-504058
Email : lstwssuc@gmail.com
FIND US
Designed and Maintained By : - Shiva Amatya, Mob No.: +977 9846320810, Email : amatyasp@gmail.com